Build A Better Methodology
6 min read
Change your methodology without breaking live work
Your methodology gets better every engagement
Most weeks, someone on your team tells you they tried something new on an engagement, and it worked. A senior mentions it in the corridor. An associate puts it in a status note. You nod, and you mean to do something with it.
Your methodology has a name, a set of phases and the templates and guides your team runs it with. It is not finished, and you would not want it to be. Every engagement teaches your team something. A question that works better. A step that needs to come earlier. A check that would have caught a problem two weeks sooner.
Each improvement lands in someone's live engagement
The trouble is when those improvements arrive. They come out of live work, and they arrive while other engagements are halfway through the same methodology.
A senior finds a better way and uses it on her engagement. A consultant hears about it over coffee and changes his engagement mid-phase, so his client gets a new survey with no warning. An associate on a third engagement never hears about it at all.
Nobody decided any of this. The change spread the way news spreads, to whoever was in the room.
Your team ends up running three versions
Six months later, your team runs three versions of the same phase. Nobody can say which version a given client is on, because no one ever decided.
A new hire learns whichever version they sat beside. Your quality control turns into you, checking each engagement against the version in your head. When a client asks why the second half of their engagement looks different from the first, nobody has a clear answer.
And the improvements that matter most stall. A senior who found something important has no way to make it the methodology, so it stays her habit. It leaves with her if she leaves.
The other choice feels safer and is worse. Some firms freeze the methodology to stop the drift. The deck stays the same for two years, while the team quietly runs something better that the firm cannot see, teach or sell.
One briefing, added three different ways
Take a made-up change management firm. Its methodology, The Adoption Path, helps a client's people take up a new system. Its team runs version 4, and one of its results is winning the sponsor's backing.
On one engagement, the sponsor's own manager had never been briefed. Halfway through, that manager moved the go-live to make room for another priority, and the sponsor could not hold the date. On her next engagement the senior briefed the sponsor's manager alongside the sponsor, before the readiness work began. It worked. She started doing it on every engagement.
Her colleague heard about it and booked a briefing with his sponsor's manager in the middle of training, without the sponsor in the room. The sponsor felt gone over her head and asked why the plan had changed. An associate on a third engagement never heard about the briefing at all, and her go-live moved when the sponsor's manager changed priorities, just as the first one had.
One good idea reached three engagements three different ways. Only one of them went well. The founder heard about the other two from the clients.
Raise it, sign it off, release it
Treat a change to your methodology as a release, with four moves.
Raise it. Anyone on the team can raise a change. They say what changes and why, and they name the engagement that taught them.
Sign it off. One named person decides, usually the methodology's owner. Before they say yes, they see every phase, template and guide the change reaches.
Release it as the next version. The change becomes version 5. Version 4 stays on record, so anyone can see what changed, when and why.
Let live work finish where it started. Engagements already running finish on the version they started with. The next engagement starts on the new one. The owner can move a live engagement across when it has not yet reached the phase that changed, and says so.
One kind of change skips the wait. A fix to something wrong, such as a template that carries another client's name, reaches every engagement now. An improvement waits for the next engagement, because the old version still works.
That is methodology version control. It keeps every version, makes each change on purpose, and tells your team which version each engagement runs.
Your team knows which version it runs
With releases, improvements reach your team the same way every time.
A senior who finds a better way raises it, and the owner can make it everyone's. A consultant mid-engagement keeps going on the version the client signed up for. When the next engagement starts, the improvement is already in it.
A new hire learns the current version and nothing older. When they ask why a step is there, the release says which engagement put it there and why.
Your sign-off moves to the right moment. You read a change once, before it reaches every engagement, with its reason and every part it touches in front of you. You no longer find it weeks later in a deliverable at night.
And when a client asks how your methodology has changed, you can show them.
You can check it on your live engagements
You do not have to take this on trust. List every engagement your team is running now. Beside each, write the version of your methodology it runs.
If you can fill in every line, your firm already releases its changes. If you cannot, ask the person leading each engagement what they changed from the deck. Each answer is a change that never reached a version. Some of them will be good enough to release this month. Others will be one client's needs, and belong in that engagement alone.
The list takes about fifteen minutes, and the gaps show up straight away.
Your best improvements reach every client
With releases, the lesson from one engagement reaches every engagement after it. Live clients get a methodology that holds steady while they are in it. Your team knows which version each client is on.
You stop carrying the current version in your head, because it has a number. And the improvements your seniors find stay with the firm, as the next version of your methodology.
When a tender or a panel asks how your methodology improves, you can show the versions in order, each with the engagement that taught it and the person who signed it off. That is a record of a firm that learns from its work, and anyone can read it.
Release your next change in under an hour
The Release Checklist takes you through it. It covers when a release is worth doing, the parts, eight timed steps, a full worked example, the checks and the common mistakes. Bring one change your team has already made and the list of engagements running now.
It is complimentary. We email you the link.
Ask for the Checklist
Enter your name and email below, and the Checklist arrives in your inbox. The Build A Better Release Practitioner Masterclass goes deeper on this article and the Checklist. Bring one change your team has made and your live engagements, find what the change reaches and decide with two other founders who moves.
Where this comes from
Version control is how software teams keep every version of their code and release changes in order. This article applies the same practice to a methodology. Research on how methods change over time makes the case for it. Matti Rossi and his colleagues argued that a method keeps changing as people use it, and that recording the reason for each change lets a team manage that change without losing its point. Pär Ågerfalk and Brian Fitzgerald called that record method rationale and showed how it guides the fitting of a method to each new situation.
Sources
Rossi, M., Ramesh, B., Lyytinen, K. and Tolvanen, J.-P. (2004). Managing Evolutionary Method Engineering by Method Rationale. Journal of the Association for Information Systems 5(9), pages 356 to 391.
Ågerfalk, P. J. and Fitzgerald, B. (2006). Exploring the Concept of Method Rationale: A Conceptual Tool for Method Tailoring. In Advanced Topics in Database Research, Volume 5. Idea Group, pages 63 to 78.
Try it yourself
Release Checklist
Release one change to your methodology as its next version in under an hour, while live engagements finish on the version they started with.
Updates
Get new articles by email
We email you when a new article is published. Nothing else.
Practitioner Masterclasses
Build A Better Methodology
Fourteen Practitioner Masterclasses for founders of transformation firms. Each is 60 minutes online and complimentary, and you leave with something your team can use.