Your phases rarely run in order

You run a firm that changes organisations

You run a transformation firm. Clients call you when a change has to land with people: a new way of working, a culture that has to shift, a program that has stalled. You have a methodology for that work. It has a name, a set of phases and a deck that explains them, and your team delivers it under your name.

You built it from real engagements. You know it works, because you have watched it work.

Your team rarely runs the phases in order

On the slide, the phases run left to right. In an engagement they rarely do.

The sponsor changes in the third week. One group is ready and the next is nowhere near. A leader who backed the change goes quiet. So your senior people do what good practitioners do. They go back a step. They skip one. They reach the same result a different way. The engagement goes well, and almost nothing they did is in your methodology.

The plan you sold was a line. The work was never a line.

What your seniors know stays in their heads

That gap costs your team every week.

A new consultant learns the phases and follows them, even after the client's situation has changed. Nobody told them when to leave the order, because that judgement was never on the page. They learn it by watching you, one engagement at a time.

Your associates fill the gap with their own habits and their own templates, and the client can tell. When a tender asks for your approach, you send the tidy version, and it reads like every other firm's. And each time the plan stops fitting, someone asks what to do now, and the question comes to you.

Your team is good. The work needs choices, and the page gives them a sequence.

One methodology ran three engagements three ways

Take a made-up change management firm. Its methodology, The Adoption Path, helps a client's people take up a new system. As written, it has six phases: stakeholder analysis, sponsor briefing, readiness assessment, training, go-live support and handover.

The first engagement ran as written. The leads met in a workshop, the sponsor was briefed one to one, a survey measured readiness, training ran, and the firm coached the client's staff before it handed over.

The second did not. The leads were too busy for a workshop, so the team read the client's structure charts and papers. The sponsor was new and unsure, so a peer who had led a change like it did the persuading. Interviews showed one group far behind. The team took that picture back to the sponsor, who cut the scope. Then champions inside each team carried the change, because people trusted their peers more than trainers.

The third ran as written until the second week after go-live. Use dropped. The team checked readiness again, found the groups that had slipped, and brought in champions inside those teams.

All three engagements went well. Only the first is in the deck. The moves that saved the second and third lived in two people's heads.

Plan results, and the ways to reach each

Each phase exists to make something true. Stakeholder analysis exists so the team knows who the change touches. The sponsor briefing exists to win the sponsor's backing. Those results hold in every engagement. The ways to reach them change.

So plan in two layers.

First, write each phase as the result it exists to reach: a verb and its object. "Know who the change touches." "Win the sponsor's backing." A result is well written when a new hire could tell that it has been reached.

Second, for each result, write every way your team has reached it, starting with "by". By a workshop with the leads. By reading the client's papers. Beside each way, write one line that starts "choose it when". "When the leads can meet within two weeks." "When the sponsor is new, or doubts the change." That line is the judgement your seniors carry.

Draw the results as circles and the ways as arrows, and you have an Intention Map. It is one page that shows what your methodology must reach and every way you know to get there.

Two things on this map are missing from a phase plan. Several arrows can join the same two circles, so one result has more than one way in. And an arrow can point back. When readiness slips after go-live, checking it again is part of the methodology.

That is nonlinear adaptive planning. It is nonlinear because the plan can branch and come back. It is adaptive because the people doing the work choose the route as the situation shows itself. The first engagement's straight line is still on the map, as one route of many.

Your team changes course inside your methodology

With the map on one page, the work changes hands differently.

A new consultant sees the results the engagement has to reach, and the ways your team has reached each one before. When the usual way closes, they find the next one on the page, and when it fits. They make the call your senior would have made, and they can say why.

Your seniors stop being the place the judgement lives. When one of them finds a new way, it goes on the map as one more arrow, and the whole team has it.

Clients see a methodology built for their situation to change, in your proposal and in the room.

You can check it on your last engagement

You do not have to take this on trust. Take your most recent engagement and trace it on your map, move by move, with one colleague who was there.

Every move your team made should be an arrow on the page. If a move is missing, your methodology has a way that nobody has drawn. Add it, with its "choose it when" line. If every move is there, your map covers that engagement.

Once the map is drawn, the check takes twenty minutes.

The questions stop coming to you first

With a map, your team answers "what do we do now?" from the page. You hear about the hard calls, the ones no arrow covers yet, and each of those becomes a new arrow.

New people reach your standard sooner, because they can see it. Your proposals describe the methodology your team runs. And each engagement that teaches you a new way leaves the whole firm better at the next one.

Draw your own map in an afternoon

The Nonlinear Adaptive Planning Handbook takes you through it. It covers when a map is worth drawing, the parts, eleven timed steps, a full worked example, twelve checks and the common mistakes. Set aside an afternoon, and bring your phases and two or three recent engagements.

It is complimentary. We email you the link.

Ask for the Handbook

Enter your name and email below, and the Handbook arrives in your inbox. The Build A Better Plan Practitioner Masterclass goes deeper on this article and the Handbook. Bring your first map, check it with two other founders and find the ways you missed.

Where this comes from

The map comes from research on describing work by its goals and the ways to reach them. Colette Rolland and her colleagues at Université Paris 1 Panthéon-Sorbonne developed it from the 1990s and called it MAP. Intention Map is our name for it.

Sources

  • Rolland, C., Prakash, N. and Benjamen, A. (1999). A Multi-Model View of Process Modelling. Requirements Engineering 4(4), pages 169 to 187.

  • Henderson-Sellers, B., Ralyté, J., Ågerfalk, P. J. and Rossi, M. (2014). Situational Method Engineering. Springer.

Try it yourself

Nonlinear Adaptive Planning Handbook

Draw an Intention Map of your own methodology in an afternoon, so your team can change course without leaving it.

We email you the link.

We use your email only for what you asked for. Our privacy policy says how we handle it.

Updates

Get new articles by email

We email you when a new article is published. Nothing else.

Unsubscribe any time.

We use your email only for what you asked for. Our privacy policy says how we handle it.

Practitioner Masterclasses

Build A Better Methodology

Fourteen Practitioner Masterclasses for founders of transformation firms. Each is 60 minutes online and complimentary, and you leave with something your team can use.